A construction project is a complex process whose planning and management has to be done with precise execution and great efficiency. The most important aspect of any construction project is to make an accurate estimate of the cost. Without a clear understanding of the cost, budgeting cannot be done, due to which no project can be started. And if the project is started without accurate understanding, then its success is very challenging and there is no guarantee whether it will be completed or not. And this is the situation where the Bill of Quantities (BOQ) plays an important role.
What is Bill of Quantities (BOQ)
BQ or BOQ is a bill of quantities prepared to specify the cost incurred in the construction industry. Labour and material cost bills are documents prepared for a construction project. Which acts as a communication tool between the clint, consultant and contractor. The task of creating a BOQ is usually done by a cost consultant or surveyor.
There are 2 types of BOQ documents and both of them are important for a construction project
1. Bill of Materials
2. Bill of Labor
To create a BOQ, the design and specifications have to be prepared. The BOQ is a list of the quantities measured in terms of number, length, area, volume, weight, and most importantly time as per the requirement of the project. Remember that BOQ is very important for large projects. On the contrary, for small projects, suppliers can measure the cost quantity of their projects from the drawings and work schedule.
From this blog of rksvkam construction, it must have become easy for you to understand what is BOQ, now let us also know about its objectives and its contribution in the success of the projects.
Basic Format of Preparing BOQ
The draft of BOQ includes Tender Form, Information,Requirements, Pricing Schedule, Provisional Amounts and Day’s Work. These are the 5 main factors of Bill of Quantities which are considered while starting the construction of any construction project.
- Item Description
- Unit
- Quantity
- Rate per Unit
- Total Amount
Procedure for preparing BOQ for RCC
BOQ Example Page
Process of creating BOQ:-
Step 1:- These 6 main components act as the pillars for BOQ. Which must be there in any construction project:
- Item Number
- Item Description
- Unit of Item
- Unit Rate
- Total Amount
- Major Sections/Parts of Standard BOQ

A standard BOQ consists of the following sections.
- Preliminary Works
- Schedule of Day’s Works
- Provisional Quotations
- Measured Works
- List of Main Quantities
- Pricing Preamble
- Rate Breakdown of Each BOQ Item
- Measured Works Sections
- Excavation and Earthwork (Foundation including Ground Slab)
- Concrete Work
- Masonry Work (Brick Work and Rubble Work)
- Roof and Roof Plumbing
- Waterproofing and Termite Treatment
- Metal Work
- Carpentry and Joinery Work
- Finish (Floor, Wall Ceiling Finish including Plastering)
- Painting and Decorating
- Plumbing and Sanitary Installation
- Air Conditioning and Ventilation
- Electrical Installation
- Safety and Security System Installation

Calculation of Materials for Reinforced Concrete Construction
For the construction of RCC we mainly need four things.
- Cement
- Sand (Fine Aggregate)
- Coarse Aggregate (CA)
- Steel (Steel Reinforcement)
Calculation of Materials for 1m³ Reinforced Concrete
Let us assume the standard quantity of 1m³ cement mortar and a mix ratio of 1:1.5:3 (1 part cement, 1.5 parts sand and 3 parts coarse aggregate). There are two methods of calculating the quantity.
1. Volume Calculation Based on Weight
2. Volume Method of Calculation of Volume
Let us consider the volume method for reinforced concrete construction.
Determination of Total Dry Volume
Quantity of cement
The formula to calculate the quantity of cement is as follows: (1.54×1)/(1+1.5+3)=0.28 m^3
Since cement is available in bags, the volume of 1 cement bag is 0.0347 m3.
0.28/0.0347=8.07 cement bags
Quantity of sand
Quantity of coarse aggregates
BOQ of Steel Reinforcement

- Slab = 1.0% of concrete volume
- Beam = 2% of concrete volume
- Column = 2.5% of concrete volume
- RCC Road = 0.6% of concrete volume
Assuming 2.5% requirement for steel reinforcement, the formula to calculate steel is:
2.5/(100×1)×7850=196.25 kg steel
Labor Estimation for Reinforced Concrete
- The labour required for the specified work quantity is as follows:
- Mason:- 0.37 days
- Unskilled Labour:-3.5 days
- Water Carrier:-1.39 days
- Bar Bender (per 100 kg steel):-1 day
- Mixer Operator:-0.0714 days
- Vibrator Operator:-0.0714 days

Additional Contractor Profits and Miscellaneous Costs
Contractor profits and miscellaneous costs vary depending on the location, organization, and nature of work. Generally, they range between 10% – 20%.
For this case, we assume:
Contractor profits: 10% of total material, labor, and equipment costs
Miscellaneous costs: 7% of total costs Adding these components helps determine the total construction cost.

Benefits of Billing of Quantities
Preparing for Challenges in Advance
Whether the project is big or small, it is important for us to write a brief description of the work to complete it. So that the problems and obstacles in its construction can be easily assessed at once. All these obstacles can be dealt with in advance. Quantitative management of quantities, which we call BOQ, is necessary to deal with these problems. By using it, we can allocate our time, energy and resources in the right way. Along with this, we can also save a lot. Big companies definitely engage BOQ experts to build most of the projects. And for this, rksvkam Construction is always with you so that you do not have to face any kind of difficulties and problems in building the project.
Plan to organize the work
BOQ finalizes the construction estimate.
Construction is completed quickly and at a lower cost
Utility and Limitations of BOQ
conclusion
Meaning of BOQ: Bill of Quantities (BOQ) plays a vital role in construction projects by providing a detailed list of quantities and prices for materials, components and work activities. Despite the challenges involved in BOQ preparation, strategies such as early involvement, thorough documentation, continuous coordination, technology adoption and regular reviews can help overcome these obstacles.
Rksvkam Construction – Your Trusted Construction Partner! Our aim is to provide the best construction services to our customers and also to tell you about the important factors used in it so that you never have to face any problem in your project construction.
Join us for Bill of Quantities Construction today!! and ___
- Save time and money with accurate BOQ and cost estimates
- Better planning, stronger construction!